Breadcrumb
- Home >
Assignment |
Geophysical investigation (2D-ERT) of fast track in chainage 16+100 to 16+500, 17+820 to18+300 and 18+600 to 19+400. |
Project |
Kathmandu -Terai/Madhes FastTrack (Express way) Road Project |
Completed Date |
November 2018 |
Assignment |
Geophysical investigation (2D-ERT) of portal sites of Malekhu-Lother road tunnel |
Project |
Feasibility Study of Malekhu-Lother road tunnel, Dhading/Chitwan, Nepal |
Completed Date |
October 2018 |
Assignment |
Geophysical investigation (2D-ERT & 2D-MASW) of Railway Alignment Package – 04, Across the Shivganga, Chaumala, and Gauriganga River, Kailali, Nepal |
Project |
Detail Design of Mechi – Mahakali Railway, Package - 04 |
Completed Date |
August 2018 |
Assignment |
Geophysical survey (2D-ERT) of Banepa Domestic Airport, Kavre, Nepal |
Project |
Detail Feasibility Study of Banepa Domestic Airport, Kavre, Nepal |
Completed Date |
June 2018 |
Assignment |
Geophysical, Geological study and seismic hazard analysis of Road Tunnel |
Project |
Detail feasibility study of road tunnels (Kulekhani-Bhimphedi Tunnel, Banepa-Sindhuli Sadak Tunnel, Pokhara-Baglung Road Tunnel, Lamabagar Road Tunnel, Butwal-Naryanghat Road Tunnel) |
Completed Date |
May 2018 |
Copyright © 2024. All rights reserved